Asda
Hard and soft landscaping refresh scheme. Excavate all required areas, supply and application of graded topsoil. Supply and plantation of 535 10ltr Shrubs (Variety species) and finish with graded bark. On numerous trees removal of dead branches and lower branches crown lifted to 2.5m to improve visibility. Dismantle of old knee rail and supply and installation 41 metres of new timber knee rail.